- Haul road has an important role in the production of open cast mine. In the mining gradient of haul road at any place not more than 1 in 16. Important duty of surveyor check and survey of proposed haul road.
Procedure:-
(1) Survey of proposed road with all details.
(2) complete the levelling work along the centre line of the proposed road.
(3) Make a plan and section.
(4)Calculate cut and fill from calculation or section drawing.
ST | B.S | I.S | F.S | H.I | R.L | DIST | |
A | 2.81 | 102.81 | 100 | 0 | |||
B | 1.31 | 101.5 | 15 | ||||
C | 2.15 | 0.32 | 104.64 | 102.49 | 30 | ||
D | 1.73 | 102.91 | 45 | ||||
E | 3.31 | 0.54 | 107.41 | 104.1 | 60 | ||
F | 0.68 | 106.73 | 90 |
In the above calculation, the gradient of the proposed road is 1 in 13.37. We observed that the 1in 13.37 gradient is more than compression to 1in 16. we should extend the length of the proposed roadDifference of R.L -A to F = 6.73 mt
Total length will be proposed road -16*6.73= 107.68 mt.
ST
|
DIST
|
R.L
|
Cal of proposed RL
|
PROPOSED RL
|
Cutting
|
A
|
0
|
100
|
100
|
100
|
0
|
B
|
15
|
101.5
|
100+15/16
|
100.93
|
0.57
|
C
|
30
|
102.49
|
100+30/16
|
101.87
|
0.62
|
D
|
45
|
102.91
|
100+45/16
|
102.81
|
0.1
|
E
|
60
|
104.1
|
100+60/16
|
103.75
|
0.35
|
F
|
75
|
105.41
|
100+75/16
|
104.68
|
0.73
|
G
|
90
|
106.73
|
100+90/16
|
105.62
|
1.11
|
H
|
107.68
|
106.73
|
100+107.68/16
|
106.73
|
0
|
Nowadays the profile make quickly from the software,